What Happens at Your Free Shower Door Measure (Step by Step)
The owner measures every job. Here's exactly what happens at your free measure: style, outage on every wall, pony walls, studs, a 3D view, and install in 7–10 business days.

Every AQ Glass Arizona job starts with a free measure at your home, and I do every measure myself. A lot of people aren't sure what happens at that appointment or why it matters so much, so here's exactly what I do, in order, and what you'll want to have thought about before I get there.
Why the measure matters more than anything
Shower glass is cut to the sixteenth of an inch, and once it's tempered it can't be trimmed. Walls are almost never perfectly straight, floors aren't perfectly level, and tile isn't perfectly flat. A good measure catches all of that before any glass is ordered. A bad one means glass that doesn't fit and weeks of waiting for a remake. That's why I don't send someone else to measure — the person measuring is the person who has to install it.
1. We talk about what you want
Before the tape measure comes out, we look at the shower together and talk about:
- Style: door and panel, door only, corner, neo-angle, slider, barn door, or a steam shower with a transom.
- Which way the door opens and which wall the valve and shower head are on. Frameless doors can swing in and out; framed doors are a little different.
- Glass: 3/8" clear is our standard. Starphire (ultra-clear), frosted and rain glass cost more. For a splash panel wider than 36", I recommend 1/2" glass so it doesn't flex.
- Hardware finish: chrome, brushed nickel, matte black, gold, brushed bronze, polished nickel and more.
- Handle: our handles are 8". For sliders, you can choose a vertical handle or a 24" towel bar with a finger-pull knob on the other panel.
2. I measure every wall and every opening
I measure the width at the top and the bottom, and the height. Then I record the outage — how far each wall leans out of plumb — for each panel and each leg, not just for the opening as a whole. Two walls that look straight can be off by a quarter inch over the height of a shower, and the glass has to follow that.
If there's a pony wall (a short half wall), I measure that opening separately: from the wall to the pony wall at the floor. The panel gets a notch so it sits on the pony wall and still reaches the floor where it needs to. If there's a header across the top, that changes the height too, and I account for it.
On corners, I measure each side to the centerline of the corner so the two pieces of glass meet and overlap correctly.
3. I check what's behind the wall
A 3/8" frameless door is heavy. I check that there's a stud behind the spot where the door hangs. On tile over a solid wall that's usually easy. On cultured marble or fiberglass, it matters even more, because the surface is thin. If there's no stud, we either add one or make the door in 1/4" glass. I'd rather tell you that at the measure than find out on install day.
If we're replacing an old framed door on cultured marble or fiberglass, I'll also show you where the yellow outline will likely be once the old frame comes off, and we'll talk about your options.
4. I tell you the honest stuff up front
Before you decide, I make sure you know how frameless glass actually works:
- Frameless isn't 100% watertight. There's about a 1/8" gap between the door and the panel and behind the hinges, so the door can swing freely.
- There's a 1/2" gap under the door for a sweep.
- Stationary panels are sealed with 100% silicone that resists mold and mildew and doesn't yellow.
- A stopper between the door and the panel can be added, but then the door only opens one way.
- Framed doors are more watertight, but they only come in 1/4" glass.
5. You see it before we order
I can send you a 3D view of your actual shower — your sizes, your style, your hardware color — by text or email, so you can see it and share it before anything is ordered. Then you get your price. Our starting prices, installed, are $1,500 for a frameless door and panel, $1,600 framed, $1,200 for a euro-style slider, $1,800 for barn door and panel or for a framed or frameless corner, $2,000 for neo-angle or corner barn, and $2,200 and up for fully custom work. There's no sales tax on our quotes.
6. Ordering and install
Once you confirm, I turn the measurements into a fabrication order with every piece, every hinge and clamp cut-out and every deduction worked out. Installs are usually 7–10 business days after the measure and your confirmation. On install day, we set the glass, level and adjust the door, and seal the panels.
We only use C.R. Laurence and U.S. Horizon hardware, with a 10-year warranty on the hardware.
How to get ready for your measure
- Clear the shower and the area in front of it so I can get to every wall.
- If you're remodeling, the tile should be finished before the final measure. Glass is measured to the finished surface.
- Have an idea of style and finish — or bring photos you like. We can decide together, too.
- Know where your towel bar or robe hook will go, so the door swing doesn't hit it.
After it's in
Arizona water spots glass, even with a softener. A quick squeegee after each shower is the best way to keep it clear. Skip Windex on shower glass — it streaks.
Common questions about the measure
Is the measure really free?
Yes. There's no charge for the measure, and you're not committed to anything until you confirm your order.
How long does it take?
It depends on the shower. A simple door and panel goes quickly. A corner with a pony wall, a steam shower with a transom, or a neo-angle takes longer, because there are more walls and openings to measure and more outage to record.
Do I need to be home?
Yes, please. Choosing the style, the door swing, the glass and the hardware is much easier standing in the bathroom together. It also lets me show you anything I notice — like a missing stud or where an old frame outline will show — before you decide.
Can you measure before my tile is done?
I can come out early to talk through the design, but the final measure has to happen on finished tile. Glass is measured to the finished surface, and even the thickness of the tile changes the size.
What if my walls aren't straight?
They almost never are, and that's normal. That's exactly why I record the outage on each wall and each leg. The glass is cut to follow your walls, so the gaps stay even from top to bottom.
Can I change my mind on the finish after the measure?
Yes, as long as the order hasn't gone in. Once the glass and hardware are ordered, changes can mean waiting for new parts, so it's worth looking at the 3D view and deciding before you confirm.
Ready to get started? Book a free measure online or call, and I'll come out, measure everything, and walk you through your options.
More guides
- Framed corner to frameless
- Replacing a sliding tub door
- Luxury frameless shower ideas
- Shower glass for rentals & flips
- Pony wall shower glass guide
- Frameless vs. framed: honest pros and cons
- Cleaning & maintaining shower glass
- Keeping glass clean with hard water
- How to measure your shower
- 3/8" vs. 1/2" shower glass
- Shower door cost in Phoenix
- Sliding & barn vs. hinged shower doors
- Shower doors for small bathrooms
- Shower door hardware finishes
- Steam shower doors: what's different
- Shower glass types compared
- How long a shower door install takes
- Why frameless showers aren't watertight
- Is EnduroShield worth it in Arizona?
- Door + panel vs. corner vs. slider
- Frameless on cultured marble or fiberglass
Your new shower glass, installed 7–10 business days after we measure.
Call for a quote in 5 minutes or less, or design your shower online and we'll confirm everything with a free on-site measurement in Arizona.