A steam shower is one of the best upgrades you can make to a bathroom, but the glass has a harder job than in a regular shower. It isn't just keeping water in. It's closing the space so the steam stays where it's made. Here's what's different about steam shower glass, and what to plan before the tile goes up.
The big difference: glass all the way to the ceiling
Steam rises. A regular shower door stops around 80" or 84", and anything above that is open air. In a steam shower, that open space would let the steam pour out. So the glass has to close the opening all the way to the ceiling.
The way I build it: a hinged door, a stationary panel next to it, and a glass transom above the door. The transom is a fixed piece of glass that fills the space between the top of the door and the ceiling. It's clamped to the stationary panel, so the panel and transom hold each other in place.
Why the transom is fixed
The transom doesn't open. It's clamped to the panel and the wall, and the door swings below it. That keeps the door a normal, manageable size and weight, while the glass above closes the space.
The door still needs its gaps
Like any frameless door, a steam shower door needs clearance to swing: about 1/8" between the door and panel and behind the hinges, and about 1/2" under the door for a sweep. Stationary panels and the transom are sealed with 100% silicone that resists mold and won't turn yellow. If your steam generator's maker calls for a tighter enclosure, tell me early, and we'll plan seals around their requirements.
Plan with your steam generator in mind
Every steam generator manufacturer has its own rules for the enclosure, like how closed it needs to be and how it should be ventilated. Before I measure, send me the make and model of your steam unit, or have your contractor send it. It's much easier to plan the glass around those rules than to change it later.
What your contractor handles
- Walls and ceiling built for steam. Waterproofing and vapor control are your contractor's or tile setter's job.
- A sloped ceiling, if specified. Many steam showers have a slightly sloped ceiling so condensation runs down the walls instead of dripping on you.
- Solid backing where hinges and clamps will mount.
- Finished surfaces before I measure. I measure after all tile is done, including the ceiling, because the transom is cut to the finished ceiling height.
Glass choices
- Thickness: 3/8" is my standard for frameless doors and panels. If the layout includes a splash panel wider than 36", I recommend 1/2" so it doesn't flex.
- Clear or Starphire: Starphire low-iron glass is a popular choice in steam showers because it's ultra-clear and shows off stone and tile. It costs more than clear, and I price it at your measure.
- EnduroShield: steam and hard water together are tough on glass. The coating helps water bead and run off, which makes cleaning easier. See is EnduroShield worth it.
Hardware
I use only C.R. Laurence and U.S. Horizon hardware, with a 10-year hardware warranty. Steam showers are often taller and heavier, so the hinges are sized to the door. Hardware colors include polished chrome, brushed nickel and matte black standard, plus polished nickel, satin brass, brushed bronze and oil-rubbed bronze. Every handle I install is 8".
Steam vs. regular shower glass
| Regular shower | Steam shower | |
|---|---|---|
| Glass height | 80" or 84" standard, custom available | To the ceiling |
| Above the door | Open | Fixed glass transom, clamped to the stationary panel |
| Planning | Measure after tile | Measure after tile and ceiling; plan around the steam unit's rules |
| Starting price (installed) | From $1,500 frameless door + panel | Fully custom, from $2,200+ |
Timeline
Steam enclosures are custom work, so plan a little extra time for design. Once I measure and you confirm, installs are usually 7–10 business days, the same as other showers. Allow about 24 hours after install for the silicone to cure before running the shower or the steam.
Care
After a steam session, open the door to let the room air out, and squeegee the glass. Wipe it weekly with a damp microfiber cloth and mild cleaner. Avoid abrasive powders and scouring pads, especially on coated glass. My glass care guide has the full routine.
Thinking about a steam shower?
You can see the layout in our 3D shower designer: choose "Steam: door + panel + transom" and set your ceiling height. Then send me the design along with your steam unit's details, and I'll come measure once the tile is finished. Call or text (623) 755-5350.
Common steam shower mistakes
- Measuring before the ceiling is finished. The transom is cut to the finished ceiling. If the ceiling changes after I measure, the transom won't fit.
- Picking the steam unit last. The steam generator's requirements affect the glass. Choose it before the glass is designed.
- No backing in the walls. Hinges and clamps need solid backing behind the tile.
- Forgetting door swing. A tall door still needs room to swing. Make sure it clears the vanity, toilet and towel bars.
- Skipping the coating. Steam leaves moisture on every surface of the glass. In hard water, that means more spotting.
Questions to bring to your contractor
- Is the ceiling flat or sloped, and what's the finished height?
- Where is the steam head, and which way does it point?
- Is there blocking or backing where the hinges and clamps go?
- When will tile be fully finished, so I can schedule the measure?
- What does the steam unit's manual say about the enclosure?
If you send me those answers before I come out, the measure goes faster and the design is right the first time.
Steam showers on a pony wall or with a bench
Many steam showers sit on a pony wall or have a built-in bench. Both work. A pony wall means the panel is notched to sit on top of the short wall, and the glass above still has to run to the ceiling. A bench inside the shower doesn't change the glass, but it affects where the door can swing and where clamps can go. I measure each part separately and plan the clamps so the glass is held properly at every edge.
Is a steam shower worth the extra glass?
That's your call, but here's what I see. Customers who use the steam a few times a week love it, especially in winter. The glass is a larger part of the budget than on a regular shower because it goes to the ceiling and includes a transom. If you're unsure, plan the glass for steam anyway when you're building a new shower. Adding a transom later means new glass for the panel too, since the transom is clamped to it.
Quick answers
- Does the transom open? No. It's fixed glass, clamped to the stationary panel.
- Can the door swing both ways? Yes, like any frameless door, unless we add a stopper.
- Can I add steam glass to an existing shower? Only if the walls and ceiling are built for steam. Ask your contractor first.
- What thickness? 3/8" standard, 1/2" for any splash panel wider than 36".
More guides
- Replacing a sliding tub door
- Luxury frameless shower ideas
- Shower glass for rentals & flips
- Pony wall shower glass guide
- Frameless vs. framed: honest pros and cons
- Cleaning & maintaining shower glass
- Keeping glass clean with hard water
- How to measure your shower
- 3/8" vs. 1/2" shower glass
- Shower door cost in Phoenix
- Sliding & barn vs. hinged shower doors
- Shower doors for small bathrooms
- Shower door hardware finishes
- Shower glass types compared
- How long a shower door install takes
- Why frameless showers aren't watertight
- Is EnduroShield worth it in Arizona?
- Door + panel vs. corner vs. slider
Your new shower glass, installed 7–10 business days after we measure.
Call for a quote in 5 minutes or less, or design your shower online and we'll confirm everything with a free on-site measurement in Arizona.
