Licensed & Insured · ROC #344709Mon–Sat 7:30 AM – 6:00 PM · Sun closed
Home / Services / Shower Door Replacement
From $1,500 installed · old door removed

Shower door replacement in Phoenix

Out with the old slider or tired framed door, in with new custom-cut glass. We remove your old door and install new frameless, framed or sliding glass across Phoenix and the Valley.

New frameless shower door and panel replacing an old door in Phoenix

Most of the shower glass I install in Phoenix replaces something that's already there: an old framed slider on a tub, a builder-grade door with a tired frame, a door with glass that's etched from years of hard water, or a shower that never had glass at all and still has a curtain rod. If you're done with your old shower door, this page walks through how replacement works and what it starts at.

Signs it's time to replace your shower door

  • The glass is cloudy or etched from Arizona's hard water and no longer comes clean.
  • The bottom track of an old slider is packed with mineral buildup.
  • The frame is corroded, the finish is worn, or the style no longer fits your bathroom.
  • You're updating the bathroom and want a frameless, modern look.
  • You're selling, renting or flipping and want the bathroom to look updated in photos.

We do new installs and replacements only. We take the old door out and put in brand-new, custom-cut tempered glass.

How shower door replacement works

  1. Free quote. Call or text a photo of your shower and the rough opening size. Most quotes take 5 minutes or less. You can also try the 3D shower builder.
  2. On-site measure. We measure every opening ourselves. Walls are rarely perfectly plumb, and every panel is cut to what's actually there.
  3. Choose your style. Layout, glass type, thickness and hardware finish.
  4. Glass is made. Custom-cut tempered safety glass.
  5. Old door out, new glass in. On install day we remove the old door, frame and track, clean off the old caulk, and install the new glass. Installation is 7–10 business days after measuring and your confirmation.

Replacement options and starting prices

Starting prices, installed:

  • Frameless door and panel with clamps: from $1,500
  • Framed door and panel: from $1,600
  • Euro-style sliding door (great for tubs): from $1,800
  • Frameless barn door and panel: from $1,800
  • Frameless or framed corner: from $1,800
  • Frameless corner barn door: from $2,000
  • Frameless neo-angle: from $2,000
  • Fully custom frameless (transoms, steam, pony walls, notches): from $2,200+

Your final price depends on size, glass and hardware, and is confirmed after the free measurement. See the full price list.

Replacing an old tub slider

Old framed tub sliders are the most common replacement I do in the Valley. A euro-style slider hangs from a top bar, so there's no deep bottom track to fill with buildup, and a barn door has no bottom track at all. Read my full guide to replacing a sliding tub door.

Framed corner to frameless: the yellow lines

Replacing an old framed corner shower with frameless glass is one of the most common jobs we do in the Valley, often in bathrooms with a garden tub. When the old frame comes off cultured marble or fiberglass, there's usually yellow tinting and a visible outline where the frame sat. You have three choices: have the shower resurfaced by a refinishing company before we install (we don't do resurfacing, but it looks best); choose a new framed corner, which hides the lines; or go frameless and we'll hide as much as possible, knowing some lines may still show. More in framed corner to frameless: what to expect.

Going from framed to frameless

Many customers replace an old framed door with frameless glass. Frameless has fewer edges and no track for minerals to collect in, so it's easier to clean in Phoenix water, and it makes the bathroom feel bigger. Frameless glass isn't watertight: there's about 1/8" at the door edge and hinges and about 1/2" under the door. If keeping every drop in matters most, a new framed door is the more watertight choice. Compare them in framed vs. frameless.

Glass and hardware

My standard frameless glass is 3/8" tempered, with 1/2" recommended for splash panels wider than 36". Framed doors use 1/4" glass. Clear, Starphire low-iron, frosted and rain glass are available. Polished chrome, brushed nickel and matte black hardware are standard; polished nickel, satin brass, brushed bronze and oil-rubbed bronze are upgrades. I only install C.R. Laurence and U.S. Horizon hardware, with a 10-year hardware warranty and my 2-year workmanship warranty.

Shower door replacement across Phoenix

We replace shower doors all over Phoenix — Arcadia, North Phoenix, Deer Valley, Desert Ridge, Ahwatukee, Laveen and everywhere in between — plus Glendale, Peoria, Scottsdale, Mesa, Chandler and the rest of the Valley. See local details on the Phoenix shower doors page.

Every replacement includes

  • Free quote and on-site measure
  • Old door, frame and track removed
  • Old caulk cleaned off
  • New custom-cut tempered glass
  • Frameless, framed, sliding or barn styles
  • Licensed & insured, ROC #344709
  • 2-year workmanship & 10-year hardware warranty
  • C.R. Laurence & U.S. Horizon hardware only
  • Installed 7–10 business days after measuring

Book a free measure

Real installs

Replacement shower doors we've installed

See the full gallery →

Frameless Shower Door and panel Phoenix
Frameless Shower Door bathtub Phoenix
Frameless Shower Door Gold Hardware Phoenix
Full Height Frameless Glass Corner Shower Door Chrome Phoenix AZ
Barn Door Shower Door Matte Black On Bathtub Phoenix AZ
Glass Barn Door Shower Door Chrome Phoenix AZ
Framed Chrome Corner Shower Phoenix
Framed Chrome Shower Phoenix AZ

Common questions

How much does shower door replacement cost in Phoenix?

Starting prices, installed: frameless door and panel with clamps from $1,500, framed door and panel from $1,600, euro-style slider from $1,800, frameless or framed corner from $1,800, neo-angle from $2,000, and fully custom from $2,200+. Your final price is confirmed after a free measurement.

Do you remove the old shower door?

Yes. Removing the old door, frame and track and cleaning off the old caulk is part of the job.

How long does replacement take?

Installation is 7–10 business days after we measure and you confirm your order.

What happens when you remove an old framed corner from cultured marble or fiberglass?

There is usually yellow tinting where the old frame sat. We don't resurface, but having a refinishing company resurface it before we install gives the best look. A new framed corner hides the lines, or with frameless we hide as much as possible.

Do I need to retile to replace my shower door?

No. Replacing the glass doesn't require tile work. If you are retiling, call us once the tile is finished, because the glass is measured to the finished walls.

Can I replace a tub slider with frameless glass?

Yes. Options include a euro-style slider, a frameless barn door and panel, a frameless door and panel if there's room for the door to swing, or a fixed splash panel.

Your new shower glass, installed 7–10 business days after we measure.

Call for a quote in 5 minutes or less, or design your shower online and we'll confirm everything with a free on-site measurement in Arizona.

Call TextBook